October Shutdown Schedule: AD is planning a four day shutdown the week of October 6th.
| |||||||||||
| October 2008 Pbar Job Summary | |||||||||||||||||||||
| 10/9/2008 8:54 | |||||||||||||||||||||
|
Shutdown % Complete |
|||||||||||||||||||||
| 100% | |||||||||||||||||||||
![]()
| Job # | Contact | Crew | Category | Job Description | % Done | Status/Notes |
| No Job # | Bob Dysert | Bob Dysert | Diagnostics | Work on bimodal output of P1 line BPMs | 100% | Disconnected the MI RF input to the 74MHz digitizer clock board for the P1 line BPMs. This should eliminate the bi-modal behavior observed on HP706 during stacking. There is a PLL on the 74MHz clock board that will attempt to lock the RF output to an input source, but this PLL was designed to lock to the TeV ramp and could not keep up with the much faster MI ramp. |
| 9100 | David Peterson (x3073) | Peterson, Dilday | Diagnostics | Check Sten style AP2 BPM cards for proper insulation along internal mounting rail. | 100% | Completed |
| 9064 | David Peterson (x3073) | Peterson, Dilday or Sheahan | Diagnostics | The A60 exhaust fan flow switch was bouncing to bad status recently. | 100% | Experts tested the system and could not repeat the problem. |
| 8228 |
Bernie x4769 |
Wisner, Sondgeroth, Bair | Diagnostics | SEM706 has no beam profile. We suspect the SEM preamp may have been damaged by radiation, and they will need to be replaced. These two preamps were last replaced in Nov 2004. | 100% | Replaced PreAmps and 6 to 12V converter boxes for SEM704 and SEM706 |
| 9113 | Mark Obrycki (x4836) | Obrycki Federwitz | ES&H | Add Pre Target ESS permit to Lithium Lens permit | 80% | Done. It is now tied into the safety systems for the Pbar Vault, Pre-vault, and Pre-Target enclosures. A separate ESS test will need to be done for each enclosure |
| 9027 | Randy Zifko (x4450) | Interlock Group | ES&H | The light beam at Intlk #1 seems to be broke or out of alignment. This is not a problem now, but it will be if the interlocks are broken at any time. If not before we will fix this at the shutdown. | 100% | Done 10/6/08 |
| 8995 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the ACC/DEB Rad Monitors | 100% | Done 10/7/08 |
| 8994 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the ACC/DEB ESS | 100% | Scheduled for evening of 10/8/08 |
| 8993 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the Vault ESS | 100% | Done 10/6/08 |
| 8992 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the Pre-Vault ESS | 100% | Scheduled for evening of 10/8/08 |
| 8991 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the Pre-Target ESS | 100% | Scheduled for evening of 10/8/08 |
| 8989 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the Transport ESS | 100% | Scheduled for evening of 10/8/08 |
| 8976 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the PBar ACC/DEB CDC | 100% | Done 10/6/08 |
| 8975 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the PBar PT/PV/V/Xport CDC | 100% | Done 10/6/08 |
| 8974 | Randy Zifko (x4450) | Safety Techs | ES&H | Test the PBar (PV/V/Xport) CDC | 100% | Done 10/6/08 |
| 8913 | Dale White (x6524) | Rad Safety | ES&H | Change Detectors | 100% | Done 10/6/08 |
| 8683 | Chuck Worel (x4836) | Interlock Group Techincians | ES&H | Check ground fault voltage circuit of the Pre-Vault Safety System. This may drop the secure of the enclosure depending upon what we find. | 100% | 10/7/08: Ground fault found. Board that went bad. |
| 9124 | Randy Zifko (x4450) | Safety Techs | ES&H | Change the ACC and DEB safety system coasting Beam controllers to make testing in the future easier. It will have to be retested which we'll do tonight around 2100 hrs. | 100% | Thursday evening |
| 8813 | Henry Gusler (x4436) | Gusler and Crabtree/ Budlong | Kickers | Bake out A20 kicker tank and shutters to improve the voltage level on the kicker module #1. This job will NOT be done if job #8730 (Hi-pot tank) is done, since the two jobs are not compatible. | 0% | Not being done. |
| 8730 | David Peterson (x3073) | Peterson, Obie, Wisner and maybe kicker experts | Kickers | Look at voltage on each end of kicker during pulse. Also do low energy hi-pots to determine breakdown threshold and polarity dependence. This job will NOT be done if job #8813 (bake out A20 kicker tank) is done. | 0% | Can not be done. The voltage to ground of the kicker is a couple hundred kilo-ohms. This is design. Three is not a DC hipotter available that can supply the necessary voltage. |
| 8528 | Bernard Wisner (x4769) | B. Wisner, C. Bair, Obie | Kickers | The electrolytic capacitors in the Spellman high voltage power supplies need to be replaced, in A:IKIK, A:EKIK, D:IKIK and D:EKIK. They have shown signs of failing recently, and this has lead to the power supply being more seriously | 100% | Done 10/7/08 |
| 7302 |
Bernie x4769 |
Obie, Bernie, Chuck | Kickers | Replace the aging matching capacitors, in the high voltage feedthroughs, on the kicker tanks, for AIKIK and AEKIK. | 80% |