Tevatron

Tevatron beam lines

1. Modification of Antiproton Source Transfer Lines and their Optics Correction (.doc)

OptiM file for transport of 120 GeV antiprotons from Main Injector to Antipoton Production Target (.opt)

OptiM file for transport of cooled antiprotons from Accumulator to Main Injector (.opt)

2. Production and collection of antiprotons (.doc)

Prsentation on Oct.25.01(.pdf)

3. Run IIB presentations

Run IIB AAC Review, Dec. 11-12, 2001

a.) Antiproton Collection ( .pdf)

b) Antiproton Transfers (.pdf)

 4. Presentation for DOE review Oct. 28-30 2002.

Beam transfers (.doc) (.pdf)

Accumulator

1. Intrabeam scattering in Accumulator, Run IIa meeting, 03.28.2002 (.pdf)

2. Beam heating in the accumulator, 05.13. 2002 (.pdf)(.doc)

 Tevatron

1. Tevatron Task force, Presentation for AAC, 02.04.2003 (.doc)(.pdf)

2. Tevatron Task force, Presentation for Director's Review, 05.05.2003 (.doc)(.pdf)

3. Luminosity modeling, Presentation to DoE review, July 21-23, 2003, (.doc) (.pdf)

4. Lattice measurements, injection errors, diagnostics, Presentation to DoE review, July 21-23, 2003, (.doc) (.pdf)

5. Optics measurements and optics correction in Tevatron, Presentation on Run II meeting, Sep. 18, 2003 (.doc) (.pdf)

6. Suppression of head-tail effects on turn-by-turn BPM measurements, Nov. 13, 2003 (.doc) (.pdf)

7. CDF to D0 Luminosity Ratio and its dependence on Luminosity, June 2004, (.pdf)

8. MEASUREMENT AND CORRECTION OF LINEAR OPTICS AND COUPLING AT TEVATRON COMPLEX, Presentation at ACAP 2004, S-Petersburg, Russia, June 29 - July 2, 2004. (.pdf) (.doc)

9. Beam-beam Effects and Luminosity Evolution in Tevatron, Presentation at seminar in CERN, July 13, 2004. (.pdf)

10. Single and Multiple Intrabeam Scattering in Hadron Colliders, Presentation at HB-2004, October 18-22, 2004, Bensheim, Germany (.pdf) (.doc)

11. Collective instabilities in the Tevatron complex, Presentation at HB-2004, October 18-22, 2004, Bensheim, Germany (.pdf) (.doc)

12. Luminosity evolution in Tevatron, Presentation at Run II meeting, December 16, 2004. (.doc) (.pdf)
 

Study results

  1. Results of optics measurements at 150 GeV performed at June 12, 2003. V. Lebedev, June 2003 (.doc) (.pdf).

Beam physics integration effort

1. Tevatron optics status, Presentation to initiate Tevatron COSY simulations, January 2004  (.doc) (.pdf)

2. Optics design, measurements and tuning, presentation at Booster meeting Jan. 14, 2004. (.doc) (.pdf)