Tevatron Daily Plan
07/22/2008 03:51:01 PM
Andreas Jansson is coordinator July 20
Jerry Annala is coordinator beginning July 21
Plan for July 22 :
|
The only plan for the Tevatron is to produce Luminosity. | |||||||
|
Middle of the night studies are not requested at this time. If the store falls out early, recover the Tevatron and prepare to shoot again. It is a good idea to run a Proton only store (uncoalesced bunch on the helix) if a store is ended by a quench, or if the Tevatron is accessed. An access to the experimental halls should not require a Proton only store. | |||||||
|
If there are problems with the Tevatron, follow these guidelines:
|
Studies Request: (only studies during reasonable hours make sense at this time).
Measure and tune up the open helix ramps. | |
Bruce and Jim Steimel could use two hours with coalesced beam to work with the bumper magnet. | |
We need to do some timing in of the vertical pinger again (shot setup or dedicated time). |
On call Schedule:
Access Requests: (after hour call in is appropriate through Scott McCormick)
|
Change the sump pump in E1. | |||||||
|
Install the crystal collimator | |||||||
|
Mechanical Group could use 2 hours in each enclosure to change pumps
|
Other maintenance:
|
Upgrade BLMs in houses in F1 and A0. | |
|
New Firmware for the 460 cards - To upgrade a house, make a C50 save file, turn of the regulators for that house, and let the expert install the new firmware. Next, re-load the proper groups from C49 (see Pat's guide), and then restore the TOP file. | |
|
Some of mechanical maintenance requests can be completed from upstairs if there is time without beam. |
Notes:
A new version of page T134 has been sent through Mecca without complete testing. It can only be tested by running the sequencer after a quench. Run as normal, and if the program crashes, it will be looked at as soon as possible.