List of Tevatron Operating Procedures (help)
![]()
![]()
§
Separator
voltage/kick angle calculator (worksheet SepKick)
§ HEP tune mult calculator for C49 (worksheet HEP tunes for C49)
§ CDF/D0 IP move DFG calculators (worksheets B0 horz IP, B0 vert IP, D0 horz IP, D0 vert IP)
Recognizing and
Documentation of a Tevatron Abort Kicker Prefire.
Restoring a 46x after card change or other disruption.
Mike
Martens Smoothing Procedure.
Demonstration
of Cogging and Tev bunch spacing
How to cold start the A0
abort kickers if the room has lost power.
Chromaticity
measurement using "head-tail" method (C100 page help)
Collecting
TBT data using Pinged beam.
![]()
Trouble
shooting problems:
Ground Fault Hunting (power point)
T:VFKNOB will not change the Tev RF frequency
Checking if collimators went to a good position during scraping
List of dead Tevatron Correction
Elements
![]()
Hunting for
Ground Faults:
Instructions for Howie's old Ground
Current Integrator (Scans of Bruce's original handwritten notes)
![]()
Startup
Plans:
Startup after summer 2007 shutdown
Obsolete
Proceedures:
Loading 465 for tune a coupling drift compensation. This is an obsolete procedure as C49 now configures these cards.
Tuning up in the Proton Pilot Aggregate
Reducing
abort gap losses with the longitudinal damper.
28 cm beta* studies (How to transition at
end of store).