TEVATRON T-980 CRYSTAL COLLIMATOR PROJECT
Pictures and Drawings:
Pictures
Pictures of misaligned face
Drawings
Laser Drawing and Write up
Mechanical:
BNL Alignment Procedure
Repair Crystal procedure
2008 Goniometer modifications
Vert IHEP Goniometer plans
Instrumentation:
Pictures of crawling wire
E1 Instrument Pictures
Plans and Schedules:
2009 Shutdown Plan
2009 Tevatron Beam Plans
2008 Tevatron Beam Plans
2007 Tevatron Beam Plans
2005 Commissioning Schedule
2005 Tevatron Crystal data
T-980 Meeting notes and agendas:
T-980 Meetings
Tevatron Crystal Talks and Papers:
D. Still "Tevatron Crystal Collimation Talk" (ppt)
Cern H8-RD22 Experiment results "Talk D. Still
Beam/Calculation Aspects:
Orientation of beam on helix at Crystal Collimator:
Data for laser vs. inchworm
Tevatron Lattice Search File
Crystal Eff. for BNL& FNAL (Carrigan)
Parameter List of Crystal, Laser, and assembly
Rough eff. Calcs from Fliller
Other related Talks and Papers:
Ray Fliller (Halo 03' talk) ppt
Crystal Collimator for LHC (Biryukov/Guidi) ppt
Crystal Collimation at BNL
Fliller Thesis_(ppt)
Fliller Thesis (full pdf)
Cern Crystal Workshop 2005
Crystal Conference and Workshops :
FNAL Crystal Collimator Workshop Dec 2007
LARP CM9 Oct 2007
CERN Crystal Channeling March 2007
Sicily Crystal Channeling Oct 2008
FNAL Crystal Collimation Workshop Oct 2008
CERN- 4th Crystal Channeling Workshop 2009
T-980 Reviews :
T-980 Installation Review Aug 8,2008
T-980 BOS Review Feb 2, 2009
Security, Privacy, Legal